Project : Anchorage Facilities at Kalametiya Lagoon
Donor : CEYNOR
Client : CEYNOR
Kalametiya is a long established fishery landing site located in Hambantota district approximately midway between the towns of Tangalle and Hambantota. The development of the lagoon as a fishing landing site has been a long felt need considering its natural protection and deep basin.
The main objectives of this project are: design off shore and shore facilities for safe navigation and year round access by providing suitable marine structures. EML was assigned to conduct preliminary investigations, socio-economic surveys, address environmental concerns and detailed designs and cost estimates of the proposed improvements including construction supervision.