- Project Name: Environmental and Social Assessment for the Proposed 50 MW Solar Power Project and 33 kV Transmission Line in Hambantota
- Project Period: August 2024 – October 2024
- Client: Gold Shimmer (Pvt) Ltd.
- Objective of the Project: To conduct a preliminary environmental and social assessment for the proposed 50 MW solar power development in Hambantota, including the associated 33 kV transmission line, in order to identify potential environmental and social impacts and guide environmentally responsible project planning. The study aimed to support informed decision-making by evaluating baseline conditions, potential risks, and mitigation measures in line with national regulatory requirements.